At the end of September, Hystar announced that Yara Clean Ammonia will join the HyPilot project, which will see the first in-field test of Hystar’s 1 MW containerized electrolyser. The PEM electrolyser will be commissioned in the second half of 2023 at the Kårstø Gas Processing Plant in Rogaland, Norway, operated by Gassco.
The HyPilot project will seek to validate Hystar’s patented PEM technology under realistic field conditions, using a containerized PEM electrolyser, in partnership with Yara, Equinor and Gassco. The electrolyser will be run for a total of 10,000 hours, providing performance data from various operating regimes to validate long-term commercial operation.
https://hystar.com/yara-clean-ammonia-joins-hypilot-project-with-hystar-equinor-and-gassco/